Wellheads Hook Up and Tie-in

Device

Meeting the client requirement in reducing the construction time to put new well on production, we have pre-fabricate, weld & tested the Tie-in spools to X-mass tree as well Control Skid with high sustainability instrumentation for pressure and flow control.

  • The Wellhead Tubing/Casing Piping connection.
  • Installation of Skid Control and instruments.
  • Wellhead to Flow Line Tie-in.